30-Dec-2011: After checking for track damage (there appeared to be none), the rerailing equipment was removed and D2.5019 slowly moved forwards over the points, heading first for Southbank for a check before being transferred to Malvern for repairs.
1,600 x 1,000 pixels; 614k